Paragraph 6
For the purpose of the main test in paragraph 8 of this Part of this Schedule the radio-frequency heating apparatus shall be switched on, and adjusted to deliver its rated output power into the work load.
For the purpose of the main test in paragraph 8 of this Part of this Schedule the radio-frequency heating apparatus shall be switched on, and adjusted to deliver its rated output power into the work load.