Chapter 4 Step two: assignment of 26 GHz upper lots for the first period in the second assignment stage round
Original text. Later amendments are not shown.
- 80Bidding for numbered 26 GHz upper lots for the first period in the second assignment stage round
- 81Preparing a 26 GHz upper lot assignment stage options list for each bidder
- 8226 GHz upper assignment stage bids
- 83Determination of the winning 26 GHz upper assignment stage bids
- 84Determination of 26 GHz upper lot first period additional prices