OpenLegislation

Chapter 4 Step two: assignment of 26 GHz upper lots for the first period in the second assignment stage round

Original text. Later amendments are not shown.

  1. 80Bidding for numbered 26 GHz upper lots for the first period in the second assignment stage round
  2. 81Preparing a 26 GHz upper lot assignment stage options list for each bidder
  3. 8226 GHz upper assignment stage bids
  4. 83Determination of the winning 26 GHz upper assignment stage bids
  5. 84Determination of 26 GHz upper lot first period additional prices