OpenLegislation

Chapter 6 Step four: assignment of 26 GHz lower lots and 26 GHz upper lots for the second period in the third assignment stage round

Original text. Later amendments are not shown.

  1. 86Assignment of 26 GHz lower lots and 26 GHz upper lots for the second period with bidding
  2. 87Preparing a 26 GHz lot second period assignment stage options list for each bidder
  3. 8826 GHz lot second period assignment stage bids
  4. 89Determination of the winning 26 GHz lot second period assignment stage bids
  5. 90Determination of 26 GHz lot second period additional prices