{
  "url": "https://openlegislation.uk/wireless-telegraphy-licence-charges-amendment-regulations-2008/regulation-3",
  "json_url": "https://openlegislation.uk/wireless-telegraphy-licence-charges-amendment-regulations-2008/regulation-3.json",
  "legislation": "uksi/2008/139",
  "legislation_title": "The Wireless Telegraphy (Licence Charges) (Amendment) Regulations 2008",
  "legislation_url": "https://openlegislation.uk/wireless-telegraphy-licence-charges-amendment-regulations-2008",
  "path": "regulation/3",
  "kind": "regulation",
  "number": "3",
  "heading": "Amendment of Schedule 2",
  "text": "(1) Schedule 2 (licence charges and payment intervals) shall be amended in accordance with the following paragraphs of this regulation.\n(2) Under the heading “Satellite Services”, for all entries in Columns 1 to 4, substitute the following entries—\n“\nSatellite (Aircraft Earth Station)\n£200\n12 months\nFor each terminal requiring technical coordination by Ofcom resulting in the variation of a licence, £200.\nSatellite (Earth Station Network)\n£200\n12 months\nFor each terminal requiring technical coordination by Ofcom resulting in the variation of a licence, £200.\nSatellite (Earth Station on Board Train)\n£200\n12 months\nFor each terminal requiring technical coordination by Ofcom resulting in the variation of a licence, £200.\nSatellite (Earth Station – Non-Fixed Satellite Service)\n£500\n12 months\nSatellite (Earth Station – Non-Geostationary)\n£500\n12 months\nSatellite (Permanent Earth Station)\nFor each site (the area contained within a circle of a radius of 500 metres centred on a point defined by the licensee), the appropriate sum calculated in accordance with the formula set out in Part 1 of Schedule 8.\n12 months\nSatellite (Transportable Earth Station)\nFor each earth station operating in the 13.78-14.5 GHz band, the appropriate sum payable in accordance with Part 3 of Schedule 8 as determined by the power and bandwidth of the earth station.\n12 months\nSatellite (Transportable Very Small Aperture Terminal)\nFor each earth station operating in the 13.78-14.5 GHz band, the appropriate sum payable in accordance with Part 3 of Schedule 8 as determined by the power and bandwidth of the earth station.\n12 months\n”\n(3) In this regulation—\n(a) the column headed “Class of licence” in Schedule 2 to the principal Regulations shall be designated as “Column 1”;\n(b) the column headed “Fixed sums” in Schedule 2 to the principal Regulations shall be designated as “Column 2”;\n(c) the column headed “Variable sums” in Schedule 2 to the principal Regulations shall be designated as “Column 3”;\n(d) the column headed “Prescribed payment interval” in Schedule 2 to the principal Regulations shall be designated as “Column 4”; and\n(e) the four columns of the grid in regulation 3(2) of these Regulations are to be inserted as Columns 1 to 4 of that Schedule.",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2008/139/regulation/3",
    "retrieved_at": "2026-11-06T03:36:23.660610+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}