# The Wirral Metropolitan Borough Council M53 Motorway (Moreton Spur Extension to Upton Bypass) Scheme 1988 Confirmation Instrument 1989, Schedule THE: THE WIRRAL METROPOLITAN BOROUGH COUNCIL M53 MOTORWAY (MORETON SPUR EXTENSION TO UPTON BYPASS) SCHEME 1988


The Wirral Metropolitan Borough Council make this scheme in exercise of their powers under sections 16 and 17 of the Highways Act 1980 and of all other enabling powers:—
1 The Council is authorised to provide for the use of traffic of classes I and II of the classes of traffic set out in Schedule 4 of the Highways Act 1980 a special road along the route described in the Schedule to this scheme.
2 The centre line of the special road is indicated by a heavy black line on the deposited plan.
3 In this scheme:—
(1) all measurements of distance are measured along the route of the relevant highway;
(2) (i) “the Council” means the Wirral Metropolitan Borough Council.
(ii) “the special road” means the special road which the Council is authorised by this scheme to provide.
(iii) “the deposited plan” means the plan marked “the Wirral Metropolitan Borough Council, M53 Motorway (Moreton Spur extension to Upton Bypass) Scheme 1988” and numbered MS/35/CR/1. sealed with the Common Seal of the Wirral Metropolitan Borough Council and deposited at the offices of the Council at Wallasey Town Hall. A certified copy is also deposited at the Department of Transport, Sunley Tower, Piccadilly Plaza, Manchester M1 4BE.
4 This scheme may be cited as “the Wirral Metropolitan Borough Council, M53 Motorway (Moreton Spur extension to Upton Bypass) Scheme 1988”.

---
Source: https://www.legislation.gov.uk/uksi/1989/2192/schedule (the official version)
Page: https://openlegislation.uk/wirral-metropolitan-borough-council-m53-motorway-moreton-spur-extension-to-upton-bypass-scheme-1988-confirmation-instrument-1989/schedule
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

