# The Wirral Metropolitan Borough Council M53 Motorway (Moreton Spur Extension to Upton Bypass) Scheme 1988 Confirmation Instrument 1989, Section 2


The said scheme as confirmed (hereinafter referred to as “the Scheme”) is set out in the Schedule hereto and copies of the Scheme with its accompanying plan are deposited at the Department of Transport, Sunley Tower, Piccadilly Plaza, Manchester M1 4BE and at the offices of the Wirral Metropolitan Borough Council at the Town Hall Wallasey.

---
Source: https://www.legislation.gov.uk/uksi/1989/2192/section/2 (the official version)
Page: https://openlegislation.uk/wirral-metropolitan-borough-council-m53-motorway-moreton-spur-extension-to-upton-bypass-scheme-1988-confirmation-instrument-1989/section-2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

