# The Wirral Tramway Order 1999, Schedule 1: SCHEDULED WORKS


In the Metropolitan Borough of Wirral–
Work No. 1—A combined street tramway and tramroad forming a single line of rails 196 metres in length commencing by a junction with the western terminus of the Wirral Tramway in Shore Road, authorised by the Wirral Tramway Light Railway Order 1994, at a point 87 metres north-east of the junction of Shore Road with Canning Street, passing across Canning Street in a south-westerly direction and terminating at a point 96 metres south-south-west of the south-western kerbline of Canning Street.
Work No. 1A—A combined street tramway and tramroad forming a single line of rails 75 metres in length commencing by a junction with Work No. 1 at a point 64 metres south-west of the south-western kerbline of Canning Street passing in a south-easterly direction towards, and passing across, Taylor Street and terminating at a point on the east side of Taylor Street 36 metres south-west of the junction of Taylor Street with Bridge Street.

---
Source: https://www.legislation.gov.uk/uksi/1999/1306/schedule/1 (the official version)
Page: https://openlegislation.uk/wirral-tramway-order-1999/schedule-1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

