# The Wrexham Gas Fired Generating Station Order 2017, Schedule 2: DOCUMENTS AND PLANS TO BE CERTIFIED

Extent: E+W+S

Table 1
(1)
Document name
(2)
Document reference
(3)
Revision number
(4)
Date
access rights of way plan
2.4
2
September 2016
book of reference
4.3
3
January 2017
design objectives statement, contained within—
design and access statement
5.3
0
March 2016
environmental statement, comprising—
Volume 1: Non-Technical Summary to Environmental Statement (English)
6.1
0
March 2016
Volume 1: Non-Technical Summary to Environmental Statement (Welsh
6.1
0
March 2016
Volume 2: Environmental Statement, Main Statement
6.2
0
March 2016
Volume 3: Environmental Statement Figures
6.3
0
March 2016
Volume 4: Environmental Statement Appendices, amended by:
6.4
0
March 2016
Appendix 14.3: Drainage Strategy
6.4.9
1
November 2016
Appendix 19.1: Draft Construction Environmental Management Plan
6.4.11
2
November 2016
Addendum to Environmental Statement Cumulative Effects Assessment - Electrical Connection
11.8
0
September 2016
illustrative landscape and ecological mitigation master plan
2.9.7 (sheet 1 of 7)
0
March 2016
land plans
2.2
5
January 2017
works plan
2.3
0
March 2016

---
Source: https://www.legislation.gov.uk/uksi/2017/766/schedule/2 (the official version)