Article 8 As to levels and formation of railway
The railway shall be laid on the same levels as, and within the existing formation of, the former railway with the exception of the section of the railway between the culvert over the Berry Ground Beck and the termination of the railway, where the railway shall be laid within the existing formation but at a maximum level of 60 centimetres below the former railway.