Paragraph 14 Allerdene bridge replacementI1
England, Wales and Scotland
The undertaker is restricted to carrying out Work No.5a as one of the works specified in paragraph (i), (ii), (iii) or (iv) of Work No. 5a as follows—
in the event that the Work No. 5a is to comprise a single span bridge structure in terms of paragraph (i) of Work No. 5a then it shall be carried out substantially in accordance with Sheet 3 of the structures engineering drawings and sections;
in the event that the Work No. 5a is to comprise a three span bridge structure in terms of paragraph (ii) of Work No. 5a then it shall be carried out substantially in accordance with Sheet 16 of the structures engineering drawings and sections;
in the event that the Work No. 5a is to comprise a six span bridge structure in terms of paragraph (iii) of Work No. 5a then it shall be carried out substantially in accordance with Sheet 4 of the structures engineering drawings and sections; or
in the event that the Work No. 5a is to comprise a seven span bridge structure in terms of paragraph (iv) of Work No. 5a then it shall be carried out substantially in accordance with Sheet 5 of the structures engineering drawings and sections.
Annotations
Commencement
- I1
Sch. 2 para. 14 in force at 9.2.2021, see art. 1
Notes on the whole SI
Textual amendments
- F1
Words in Preamble inserted (1.5.2021) by The A1 Birtley to Coal House Development Consent (Correction) Order 2021 (S.I. 2021/551), art. 1, Sch.
- F2
Words in Preamble omitted (1.5.2021) by virtue of The A1 Birtley to Coal House Development Consent (Correction) Order 2021 (S.I. 2021/551), art. 1, Sch.