OpenLegislation

Paragraph 1 A 27.33 kilometre length of new highwayI1

England and Wales

A 27.33 kilometre length of new highway to be classified (as identified in sub-paragraphs 1(a) to 1(c) below) as part of the A14 Trunk Road (such length also including existing highway to be improved, as identified in sub-paragraph 1(d) below)—

(a)

commencing from a point 298 metres east of the point where Footpath Ellington 23 (also known as Footpath 71/23), runs adjacent to the eastern boundary of the pumping station, located to the south of the A14, and continuing from that point in an easterly then a south-easterly direction for a distance of 1.45 kilometres to the centre point of a bridge which is proposed to be constructed over the existing A1 Trunk Road to carry this new A14 Trunk Road;

(b)

then continuing in a south-easterly then a south-south-easterly direction for a distance of 1.97 kilometres to the centre point beneath a proposed bridge which is to be constructed to carry the new link between the southbound carriageway of the existing A1 Trunk Road and the new A14 Trunk Road;

(c)

then continuing in a south-easterly, then an easterly, then a south-easterly direction for a distance of 16.32 kilometres to the point where it meets Bridleway 225/14 (towards the east of the A14 Swavesey Junction); and

(d)

then continuing in a south-easterly direction along the existing A14 Trunk Road for a distance of 7.59 kilometres to a point 514 metres south-east of where Beck Brook passes below the A14 Trunk Road in a culvert (towards the north-east of the A14 Girton Interchange),

identified by a blue line on the classification of roads plans – sheets 1 and 2.

Annotations

Commencement

I1

Sch. 3 Pt. 6 para. 1 in force at 1.6.2016, see art. 1