Schedule 7 LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKENI1
England and Wales
(1) Location | (2) Plan reference number(s) shown on Land Plans | (3) Purpose for which temporary possession may be taken | (4) Relevant part of the authorised development |
|---|---|---|---|
| Land Plans – Sheet 1 | |||
| In the administrative area of North East Lincolnshire Council | 1/1n, 1/1p, 1/1q, 1/5b | Required to provide construction working area and access for site traffic. | All works |
| 1/1s, 1/4b, 1/4c | Required for borrow pits to source material to construct raised sections of the new road construction. | All works | |
| 1/1ae, 1/1al, 1/1am | Required to provide an area for topsoil and other construction material storage. | All works | |
| In the administrative area of North Lincolnshire Council | 1/1a | Required to enable the use of the existing access track between the A160, Ryehill Farm and A1077 Ulceby Road. | Work No. 1 |
| 1/1b, 1/1c, 1/1d, 1/1e, 1/1f, 1/1h, 1/1i, 1/1j, 1/1k, 1/1m, 1/1u, 1/1v, 1/1w, 1/1x, 1/1z, 1/1af, 1/1ag, 1/1ai, 1/1aj, 1/2a, 1/3a, 1/3c, 1/3d, 1/3e, 1/3f | Required to provide construction working area and access for site traffic. | All works | |
| 1/1t, 1/1ak | Required for the diversion of an electric cable and associated apparatus. | Work No. 9 | |
| 1/1y, 1/1ah | Required for the diversion of electric cables and associated apparatus and to provide construction working area and access for site traffic. | All works | |
| Land Plans – Sheet 2 | |||
| In the administrative area of North Lincolnshire Council | 2/1a, 2/2a, 2/5f, 2/5h, 2/5k, 2/8b, 2/10b | Required for the construction of accesses. | All works |
| 2/2b, 2/2c | Required for the diversion of a water pipeline and electric cable and associated apparatus, and required to provide construction working area and access for site traffic. | All works | |
| 2/2e | Required to provide construction working area and access for site traffic and also the diversion of water pipeline and overhead electric cable. | All works | |
| 2/2f | Required for the diversion of a water pipeline and electric cable and associated apparatus. | Work Nos. 10 & 11 | |
| 2/5a, 2/6a | Required for the diversion of up to 2 water pipelines. | Work No. 12 | |
| 2/5c | Required to provide construction working area and access for site traffic and also the diversion of up to 3 high pressure gas pipelines and the protection of an intermediate pressure gas pipeline. | All works | |
| 2/5d | Required for the diversion of up to 3 high pressure gas pipelines and the protection of an intermediate pressure gas pipeline. | Work No. 15, 16 & 17 | |
| 2/5e, 2/5i, 2/5l, 2/5m, 2/7b, 2/7h, 2/7j, 2/9a | Required to provide construction working area and access for site traffic. | All works | |
| 2/5j, 2/10c | Required to provide topsoil and other construction material storage areas. | All works | |
| 2/6c | Required for the diversion of up to 3 high pressure gas pipelines and the protection of an intermediate pressure gas pipeline. | Work Nos. 14, 15 & 16 | |
| 2/7c | Required to provide topsoil and other construction material storage areas, and required to provide construction working area and access for site traffic. | All works | |
| 2/7d | Required for the diversion of an electric cable and associated apparatus. | Work No. 11 | |
| 2/7e | Required for the provision of the main site compound to include, but not limited to, site offices, welfare facilities, parking provisions, storage of plant and materials and the treatment of site generated waste and also to provide construction working area and access for site traffic. | All works | |
| 2/7f | Required to provide construction working area and access for site traffic and also the diversion of a high pressure gas pipeline. | Work No. 14 | |
| 2/7g | Required for the diversion of a high pressure gas pipeline. | Work No. 14 | |
| 2/8a | Required for the diversion of a high pressure gas pipeline. | Work No. 17 | |
| Land Plans – Sheet 3 | |||
| In the administrative area of North Lincolnshire Council | 3/1, 3/2a | Required for the construction of a new access and the stopping up of an existing access. | All works |
| 3/5b, 3/5d | Required for the construction of the diversion to the existing Public Right of Way and the construction of up to 3 new drainage culverts and head walls. | All works | |
| 3/9c | Required for the construction of a new access. | All works | |
| 3/9d | Required to provide an area for topsoil and other construction material storage. | All works | |
| Land Plans – Sheet 4 | |||
| In the administrative area of North Lincolnshire Council | 4/1d, 4/1g, 4/1j | Required for the diversion of an oxygen pipeline. | Work No. 30 |
| 4/1h, 4/3d, 4/6d | Required for the construction of accesses. | All works | |
| 4/1i, 4/1k | Required to provide an area for topsoil and other construction material storage. | All works | |
| 4/4a, 4/8 | Required to provide construction working area and access for site traffic. | All works | |
| 4/5a, 4/5b, 4/5c | Required for the construction of a new bridge under the existing railway and for construction working area. | Work No. 29 | |
| 4/7 | Required for the provision of a secondary site compound to include, but not limited to, site offices, welfare facilities, parking provisions, storage of plant and materials and the treatment of site generated waste. | All works | |
Annotations
Commencement
- I1
Sch. 7 in force at 25.2.2015, see art. 1