Schedule 2
The location and general design of the new bridge crossing the Swale are shown on the plan.
Points of commencement and Termination of the Bridge
| Commencement | The bridge commences approximately 486 metres southwest of the point where the existing Kingsferry Bridge crosses the southwest bank of the Swale. |
| Termination | The bridge terminates approximately 571 metres northeast of the point where the existing Kingsferry Bridge crosses the northeast bank of the Swale. |
| Spans | The overall length of the bridge is 1270.5 metres in nineteen spans. The central span is 92.5 metres. |
| Headway | Not less than 29 metres above Mean High Water Spring tide level, this being 2.8 metres Above Ordnance Datum (AOD) Newlyn. |
| Waterway | A minimum clear navigable waterway of 72.5 metres. |
| Overall Dimensions | The bridge will be 1270.5 metres long and will carry a dual carriageway 7.3 metres wide (two lanes) in each direction. The central reserve will be 2.5 metres wide (including 0.7 metre wide hard strips) and there will be a 0.7 metre wide raised paved verge on the nearside of each carriageway. |