OpenLegislation

The A27 Trunk Road (Patching Junction Improvement) Order 1993

S.I. 1993/1293 · Made 10 May 1993

Original text. legislation.gov.uk does not revise statutory instruments, so later amendments are not shown here. Changes made to it are listed under each provision when known.

HIGHWAYS, ENGLAND AND WALES

Made 10th May 1993

Coming into force 25th June 1993

The Secretary of State for Transport makes this Order in exercise of powers conferred by sections 10 and 41 of the Highways Act 1980f1, and now vested in himf2, and of all other enabling powers:—

Annotations to the whole text

Footnotes

f1

1980 c. 66.

f2

S.I. 1981/238.

Contents

  1. 1Article 1
  2. 2Article 2
  3. 3Article 3
  4. 4Article 4
  5. 5Article 5
  6. Signature
  7. Schedule THEROUTE OF THE NEW TRUNK ROAD

1

The new highway which the Secretary of State proposes to construct along the route described in the Schedule to this Order shall become a trunk road as from the date when this Order comes into force.

2

The centre line of the new trunk road is indicated by a heavy black line on the deposited plan.

3

The Secretary of State directs as respects any part of a highway which crosses the route of the new trunk road that—

(a)

where the highway is a highway maintainable at the public expense by a local highway authority, the part in question shall be maintained by that authority, and

(b)

where the highway is not a highway so maintainable and is not maintainable under a special enactment or by reason of tenure, enclosure or prescription, the Secretary of State shall be under no duty to maintain the part in question,

until, in either case, a date to be specified in a notice given by the Secretary of State to the highway authority for that highway. The date specified will not be later than the date on which the relevant route is opened for the purpose of through traffic.

4

In this Order—

(1)

all measurements of distance are measured along the route of the relevant highway;

(2)
(i)

“the deposited plan”

means the plan numbered PSE/0/A27/4E/65/2/5 marked “The A27 Trunk Road (Patching Junction Improvement) Order 1993” signed by authority of the Secretary of State and deposited at the Department of Transport, Romney House, 43 Marsham Street, London SW1P 3PY;
(ii)

“the new trunk road”

means the highway mentioned in article 1 of this Order; and
(iii)

“the trunk road”

means the A27 Trunk Road.

5

This Order shall come into force on 25th June 1993 and may be cited as The A27 Trunk Road (Patching Junction Improvement) Order 1993.

Signature

Signed by authority of the Secretary of State for Transport

J. W. Fellows

Regional Director South East Region

Department of Transport

10th May 1993

Schedule THEROUTE OF THE NEW TRUNK ROAD

The route of the new trunk road is at Patching in the County of West Sussex, and is a route about 1.9 kilometres (1.2 miles) in length starting at a point on the trunk road approximately 280 metres east of its junction with Dapper’s Lane and proceeding eastwards passing through Ecclesden Common, Water Lane (A280) and Pot Lane before rejoining the trunk road 80 metres west of its junction with Titnore Lane.