The A282 Trunk Road (Dartford-Thurrock Crossing Charging Scheme) (Variation) Order 2025
S.I. 2025/853 · Made 14 July 2025
HIGHWAYS, ENGLAND
Made 14th July 2025
Coming into force 1st September 2025
The Secretary of State makes this Order in exercise of the powers conferred by sections 163(3)(d), 167(1)(a) and (2)(a), 168(1) and (2) and 171(1)(d) of the Transport Act 2000f1.
The Secretary of State has, in accordance with regulation 11(2) of the Trunk Road Charging Schemes (Bridges and Tunnels) (England) Procedure Regulations 2001f2, published notice of her intention to implement this variation.
Annotations to the whole text
Footnotes
- f1
-
2000 c. 38; section 167(1)(a) was amended by the Infrastructure Act 2015 (c. 7), Schedule 1, paragraph 126. Section 168(2) was amended by the Local Transport Act 2008 (c. 26), Schedule 5, paragraph 4, the Local Democracy, Economic Development and Construction Act 2009 (c. 20), Schedule 6, paragraph 109, and the Levelling-up and Regeneration Act 2023 (c. 55), Schedule 4, paragraph 142. There are further amendments to sections 163, 167 and 171 which are not relevant to this Order.
- f2
Contents
- 1Citation, commencement and extent
- 2Variation of the A282 Trunk Road (Dartford-Thurrock Crossing Charging Scheme) Order 2013
- Signature
- Explanatory note
1Citation, commencement and extent
This Order may be cited as the A282 Trunk Road (Dartford-Thurrock Crossing Charging Scheme) (Variation) Order 2025 and comes into force on 1st September 2025.
This Order extends to England and Wales.
2Variation of the A282 Trunk Road (Dartford-Thurrock Crossing Charging Scheme) Order 2013
Schedule 2 (charges payable under the first charging regime and the second charging regime) to the A282 Trunk Road (Dartford-Thurrock Crossing Charging Scheme) Order 2013f1 is varied as follows.
In column 4—
at item B, for “£2.50” substitute “£3.50”;
at item C, for “£3.00” substitute “£4.20”;
at item D, for “£6.00” substitute “£8.40”.
Signature
Signed by authority of the Secretary of State for Transport
Lilian Greenwood
Parliamentary Under Secretary for Transport
Department for Transport
14th July 2025
Explanatory note
(This note is not part of the Order)
This Order varies the A282 Trunk Road (Dartford-Thurrock Crossing Charging Scheme) Order 2013 (“the 2013 Order”), which introduced the current charging scheme in respect of the roads carried by the Dartford Crossing.
Article 2 of this Order increases the charges applicable under the free-flowing charging regime in the 2013 Order by 40%.
A full impact assessment has not been produced for this instrument as it amends provisions relating to a charge.