The A282 Trunk Road Dartford–Thurrock Approach Roads London Road (Slip Road) Order 1989 in England
S.I. 1989/817 · Made 5 May 1989
HIGHWAYS, ENGLAND AND WALES
Made 5th May 1989
Coming into force 15th June 1989
The Secretary of State for Transport makes this Order in exercise of powers conferred by section 10 of the Highways Act 1980f1, and now vested in him f2, and of all otherenabling powers:
Annotations to the whole text
Footnotes
- f1
- f2
-
S.I. 1981/238.
Contents
1
The new highway which the Secretary of State proposes to construct along the route described in the Schedule to this Order (“the new trunk road”) shall become a trunk road as from the date when this Order comes into force.
2
The centre line of the new trunk road is indicated by a heavy black line on the deposited plan.
3
In this Order:—
“the deposited plan” means the plan numbered RSE/A282/65/2/1 marked “The A282 Trunk Road Dartford–Thurrock Approach Roads London Road (Slip Road) Order 1989”, signed by authority of the Secretary of State and deposited at the Department of Transport, Romney House,43 Marsham Street, London SW1 3PY;
“the trunk road” means the Dartford–Thurrock Trunk Road (A282).
4
This Order shall come into force on 15th June 1989 and may be cited as the A282 Trunk Road Dartford–Thurrock Approach Roads London Road (Slip Road) Order 1989.
Signature
Signed by the authority of the Secretary of State
D. Gruffydd Jones
Regional Director South East Region
Department of Transport
5th May 1989
ROUTE OF THE NEW TRUNK ROAD
The route of the new trunk road is southwards from a junction with London Road to a point where it joins the trunk road and is given the reference number 1 on the deposited plan.