Paragraph I1
England and Wales
Work No. 1 – Shown on sheets 1, 2, 3 and 4 of the works plans is the construction of the A303 eastbound totalling 5590 metres in length, between point E 300 metres east of Higher Farm Lane Overbridge and point F 550 metres west of the Sparkford Railway Bridge. To include the construction of a new compact junction at Downhead to connect the A303 to the ‘Downhead Junction Link’ (Work No.18).
Annotations