Schedule 5 LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED

Original text. Later amendments are not shown.

(1)(2)(3)
Plot reference number shown on land plansPurpose for which rights over land may be acquiredRelevant part of the authorised development
Land Plans – Sheet 1
1/3aRequired for the establishment and maintenance of environmental mitigation and enhancement areasWork No. 8
1/3bRequired for the establishment and maintenance of environmental mitigation and enhancement areas and the diversion and maintenance of and access to utilities and the establishment and maintenance of flood storage areasWork No. 1, 8 and 9
1/4bRequired for the establishment of environmental mitigation and enhancement and the diversion and maintenance of and access to utilitiesWork No. 8 and 9
Land Plans – Sheet 2
2/1bRequired for the diversion and maintenance of and access to utilities and the establishment and maintenance of environmental mitigation and enhancementWork No. 8 and 9
2/1cRequired for the construction of a diverge slip road and for the establishment of environmental mitigation and enhancement areas and the construction of highway drainage attenuationWork No. 2 and 8
2/1fRequired for the construction of a cycle track and the diversion and maintenance of and access to utilitiesWork No. 3 and 9
2/1oRequired for the construction and reconfiguration of the junction between Lyttelton Street and Kingsway Park Close and the diversion and maintenance and access to utilitiesWork No. 7 and 9
2/1pRequired for the construction and reconfiguration of the junction between Lyttelton Street and Kingsway Park Close and the diversion and maintenance and access to utilitiesWork No. 7 and 9
2/7a and 2/8Required for the diversion construction and maintenance of a cycle trackWork No. 3
2/9Required for the construction and maintenance of a cycle track and the diversion and maintenance of and access to utilitiesWork No. 3 and 9
2/13aRequired to construct a link road and the diversion and maintenance and access to utilitiesWork No. 7 and 9
2/19aRequired to construct a link road and the diversion and maintenance of and access to utilities and the construction of footwaysWork No. 7 and 9
2/19bRequired to construct a link road and the diversion and maintenance of and access to utilities and the reconfiguration of Lyttelton junctionWork No. 7 and 9
Land Plans – Sheet 3
3/1p and 3/1qRequired for the construction of a northbound diverge slip road and the diversion and maintenance of and access to utilities and the stopping up of the Enfield Road entry and exit roadsWork No. 11 and 22
3/1w and 3/1xRequired for the diversion and maintenance of and access to a utility corridor and construction of a new emergency accessWork No. 16 and 21
3/5aRequired for the alteration, realignment and grading of highway; the construction, improvement and realignment of cycle track and the diversion and maintenance of and access to utilitiesWork No. 10, 15 and 22
3/9bRequired for alterations to the access to and egress from the filling station and fast-food site and the diversion and maintenance of utilitiesWork No. 16 and 22
3/16a, 3/17 and 3/19Required for the construction and alteration of a private means of accessWork No. 16
3/22bRequired for the construction of a southbound diverge slip and alteration realignment and grading of highway and the construction and maintenance of a noise barrier and alterations to the access to and egress from the A52 to the Royal School for the DeafWork No. 13 and 16
Land Plans – Sheet 4
4/1bRequired for the diversion and maintenance of and access to a utility corridor and for the demolition of a footbridge and replacement of a footbridgeWork No. 10 and 21
4/1dRequired for the alteration, realignment and grading of a highwayWork No. 10, 21 and 22
4/7bRequired for the construction and maintenance of a noise barrierWork No. 13
Land Plans – Sheet 6
6/2Required for the construction and maintenance of a flood plain compensation area and the diversion and maintenance of and access to utilitiesWork No. 31
Land Plans – Sheet 7
7/5Required for the construction and maintenance of a flood plain compensation area and the diversion and maintenance of and access to utilitiesWork No. 31
Land Plans – Sheet 8
8/6Required for the access construction and maintenance of a railbridgeWork No. 23
8/23b, 8/25c and 8/21Required for the diversion and maintenance of and access to utilitiesWork No. 35
Land Plans – Sheet 9
9/6bRequired for the alteration, realignment and grading of northbound and southbound carriageways, the construction of a southbound diverge slip road and the diversion and maintenance of and access to utilitiesWork No. 23, 26 and 35