The A417 Missing Link Development Consent Order 2022
S.I. 2022/1248 · Made 16 November 2022
Infrastructure Planning
Made 16th November 2022
Coming into force 7th December 2022
The application was examined a panel (appointed by the Secretary of State) in accordance with Chapter 4 of Part 6 of the 2008 Act and the Infrastructure Planning (Examination Procedure) Rules 2010f3.
The panel, having considered the representations made and not withdrawn and the application together with the accompanying documents, in accordance with section 83 of the 2008 Act, has submitted a report and recommendation to the Secretary of State.
The Secretary of State, having considered the representations made and not withdrawn, and the report of the panel, has decided to make an Order granting development consent for the development described in the application with modifications which in the opinion of the Secretary of State do not make any substantial changes to the proposals comprised in the application.
The Secretary of State is satisfied that replacement land has been or will be given in exchange for the common land (as defined in article 39 of this Order), and the replacement land (as defined in that article) has been or will be vested in the prospective seller and subject to the same rights, trusts and incidents as attached to the common land, and that, accordingly, section 131(4) of the 2008 Act applies.
The Secretary of State is satisfied that the land plots identified in the special category land plans and the book of reference as open space authorised to be permanently compulsorily acquired under this Order are required for the widening or drainage of an existing highway or partly for the widening and partly for the drainage of such a highway, and that the giving in exchange of other land is unnecessary, whether in the interests of the persons, if any, entitled to rights of common or other rights or in the interests of the public and that, accordingly, section 131(5) of the 2008 Act applies.
The Secretary of State is satisfied that the land identified in the special category land plans and the book of reference as open space over which rights may be acquired compulsorily under this Order, when burdened with any new rights authorised to be compulsorily acquired under this Order, will be no less advantageous than it was before to the persons in whom it is vested, other persons, if any, entitled to rights of common or other rights, and the public, and that, accordingly, section 132(3) of the 2008 Act applies.
The Secretary of State, in exercise of the powers conferred by sections 114f4, 115f5, 117f6, 120f7, 122f8 and 123f9 of, and paragraphs 1 to 4, 10 to 17, 19 to 23, 33, 36 and 37 of Part 1 of Schedule 5 to, the 2008 Act, makes the following Order—
Annotations to the whole text
Footnotes
- f1
-
2008 c. 29. Parts 1 to 7 were amended by Chapter 6 of Part 6 of the Localism Act 2011 (c. 20).
- f2
-
S.I. 2009/2264, amended by S.I. 2010/439, S.I. 2010/602, S.I. 2012/635, S.I. 2012/2654, S.I. 2012/2732, S.I. 2013/522, S.I. 2013/755, S.I. 2014/469, S.I. 2014/2381, S.I. 2015/377, S.I. 2015/1682, S.I. 2017/524, S.I. 2017/572, S.I. 2018/378, S.I. 2019/734 and S.I. 2020/1534.
- f3
-
S.I. 2010/103, amended by S.I. 2012/635.
- f4
-
Section 114 was amended by paragraph 55 of Part 1 of Schedule 13 to the Localism Act 2011 (c. 20).
- f5
-
Section 115 was amended by paragraph 56 of Part 2 of Schedule 13 and Part 20 of Schedule 25 to the Localism Act 2011 and section 160 of the Housing and Planning Act 2016 (c. 22) and section 43 of the Wales Act 2017 (c. 4).
- f6
-
Section 117 was amended by paragraph 58 of Part 1 of Schedule 13, and Part 20 of Schedule 25 to, the Localism Act 2011.
- f7
-
Section 120 was amended by section 140 of, and paragraph 60 of Part 1 of Schedule 13 to, the Localism Act 2011.
- f8
-
Section 122 was amended by paragraph 62 of Part 1 of Schedule 13 to the Localism Act 2011.
- f9
-
Section 123 was amended by paragraph 62 of Part 1 of Schedule 13 to the Localism Act 2011.
Contents
- Part 1: PRELIMINARY
- 1Citation and commencement
- 2Interpretation
- 3Disapplication of legislative provisions
- 4Maintenance of drainage works
- Part 2: PRINCIPAL POWERS
- 5Development consent etc. granted by the Order
- 6Maintenance of authorised development
- 7Planning permission
- 8Limits of deviation
- 9Benefit of Order
- 10Consent to transfer benefit of Order
- Part 3: STREETS
- 11Street works
- 12Application of the 1991 Act
- 13Construction and maintenance of new, altered or diverted streets and other structures
- 14Classification of roads, etc.
- 15Temporary stopping up and restriction of use of streets
- 16Permanent stopping up and restriction of use of streets and private means of access
- 17Access to works
- 18Clearways
- 19Traffic regulation
- 20Cotswold Way national trail
- Part 4: SUPPLEMENTAL POWERS
- 21Discharge of water
- 22Protective works to buildings
- 23Authority to survey and investigate the land
- Part 5: POWERS OF ACQUISITION
- 24Compulsory acquisition of land
- 25Compulsory acquisition of land – incorporation of the mineral code
- 26Time limit for exercise of authority to acquire land compulsorily
- 27Compulsory acquisition of rights and restrictive covenants
- 28Public rights of way
- 29Private rights over land
- 30Modification of Part 1 of the 1965 Act
- 31Application of the 1981 Act
- 32Acquisition of subsoil or airspace only
- 33Rights under or over streets
- 34Temporary use of land for carrying out the authorised development
- 35Temporary use of land for maintaining the authorised development
- 36Statutory undertakers
- 37Apparatus and rights of statutory undertakers in stopped up streets
- 38Recovery of costs of new connections
- 39Special category land
- Part 6: OPERATIONS
- 40Felling or lopping of trees and removal of hedgerows
- 41Removal of human remains
- Part 7: MISCELLANEOUS AND GENERAL
- 42Application of landlord and tenant law
- 43Operational land for purposes of the 1990 Act
- 44Defence to proceedings in respect of statutory nuisance
- 45Protective provisions
- 46Certification of plans etc.
- 47Service of notices
- 48Arbitration
- Signature
- Schedule 1AUTHORISED DEVELOPMENT
- Schedule 2: REQUIREMENTS
- Part 1: REQUIREMENTS
- 1Interpretation
- 2Time limits
- 3Environmental Management Plan (Construction Stage)
- 4Details of consultation
- 5Landscaping
- 6Implementation and maintenance of landscaping
- 7Fencing
- 8Land and groundwater contamination
- 9Archaeology
- 10Protected species
- 11Detailed design
- 12Surface and foul water drainage
- 13Noise Mitigation
- 14Approvals and amendments to approved details
- Part 2: PROCEDURE FOR DISCHARGE OF REQUIREMENTS
- 15Applications made under requirements
- 16Further information
- 17Register of requirements
- 18Anticipatory steps towards compliance with any requirement
- Schedule 3CLASSIFICATION OF ROADS, ETC.
- 1TRUNK ROADS
- 2ROADS TO BE DE-TRUNKED
- 3CLASSIFIED ROADS
- 4UNCLASSIFIED ROADS
- 5SPEED LIMITS
- 6TRAFFIC REGULATION MEASURES (CLEARWAYS AND PROHIBITIONS)
- 7REVOCATIONS & VARIATIONS OF EXISTING TRAFFIC REGULATION ORDERS
- 8PUBLIC RIGHTS OF WAY
- Schedule 4PERMANENT STOPPING UP OF HIGHWAYS AND PRIVATE MEANS OF ACCESS & PROVISION OF NEW HIGHWAYS AND PRIVATE MEANS OF ACCESS
- 1HIGHWAYS TO BE STOPPED UP FOR WHICH NO SUBSTITUTE IS TO BE PROVIDED
- 2HIGHWAYS TO BE STOPPED UP FOR WHICH A SUBSTITUTE IS TO BE PROVIDED AND NEW HIGHWAYS WHICH ARE OTHERWISE TO BE PROVIDED
- 3PRIVATE MEANS OF ACCESS TO BE STOPPED UP FOR WHICH NO SUBSTITUTE IS TO BE PROVIDED
- 4PRIVATE MEANS OF ACCESS TO BE STOPPED UP FOR WHICH A SUBSTITUTE IS TO BE PROVIDED AND NEW PRIVATE MEANS OF ACCESS WHICH ARE OTHERWISE TO BE PROVIDED
- Schedule 5LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED
- Schedule 6: MODIFICATION OF COMPENSATION AND COMPULSORY PURCHASE ENACTMENTS FOR CREATION OF NEW RIGHTS AND IMPOSITION OF RESTRICTIVE COVENANTS
- Compensation enactments
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- Application of Part 1 of the 1965 Act
- 4Paragraph 4
- 5Paragraph 5
- Schedule 7LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN
- Schedule 8: PROTECTIVE PROVISIONS
- Part 1: FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWERAGE UNDERTAKERS
- 1Paragraph 1
- 2Paragraph 2
- 3On street apparatus
- 4Apparatus in stopped up streets
- 5Protective works to buildings
- 6Acquisition of land
- 7Removal of apparatus
- 8Facilities and rights for alternative apparatus
- 9Retained apparatus
- 10Expenses and costs
- 11Expenses and costs
- 12Cooperation
- 13Cooperation
- Part 2: FOR THE PROTECTION OF OPERATORS OF ELECTRONIC COMMUNICATIONS CODE NETWORKS
- 14Paragraph 14
- 15Paragraph 15
- 16Paragraph 16
- 17Paragraph 17
- 18Paragraph 18
- 19Paragraph 19
- Schedule 9DOCUMENTS TO BE CERTIFIED
- Explanatory note