In this Order—

(1)

all measurements of distance are measured along the route of the relevant highway;

(2)
(i)

“the main new road” means the new highway which the Secretary of State proposes to construct along the route described in Schedule 1 to this Order;

(ii)

“the new trunk roads” means the main new road and the slip roads;

(iii)

“the plan” means the plan marked “The A500 Trunk Road (Stoke Pathfinder Project) and Slip Roads Order 2003” comprised in plan Folio numbered HA/14/0D/381. signed by authority of the Secretary of State for Transport and deposited at DfT Records Management Branch, Ashdown House, St Leonards on Sea, Hastings, East Sussex TN37 7GA; and

(iv)

“the slip roads” means the new highways which the Secretary of State proposes to construct along the routes described in Schedule 2 to this Order and which connect the main new road with other highways or proposed highways at the places stated in that Schedule.