OpenLegislation

Article 2

Original text. Later amendments are not shown.

In this Order–

(i)

“the new trunk road” means the new trunk road to be constructed by the Secretary of State in pursuance of the (A5) London-Holyhead Trunk Road and Slip Roads and the(A49) Newport-Shrewsbury-Whitchurch-Warrington Trunk Road (A5/A49) Shrewsbury By-Pass and Improvements) Order 1985f1 and the (A5) London-Holyhead Trunk Road and Slip Roads and the (A49) Newport-Shrews-bury-Whitchurch-Warrington Trunk Road (A5/A49 Shrewsbury By-Pass and Improvements) (Overley Hill) (No. 2) Order 1985f2;

(ii)

“the River Severn Crossing” means the bridge to be constructed by the Secretary of State over the River Severn at Uffington in pursuance of the (A5) London-Holyhead Trunk Road and Slip Roads and the (A49) Newport-Shrews-bury-Whitchurch-Warrington Trunk Road (A5/A49 Shrewsbury By-Pass and Improvements) Order 1985.

Annotations

Footnotes

f1

S.I. 1985/1703.

f2

S.I. 1985/1704.