OpenLegislation

The A63 Trunk Road (Selby Bypass) Order 1993

S.I. 1993/286 · Made 11 February 1993

Original text. legislation.gov.uk does not revise statutory instruments, so later amendments are not shown here. Changes made to it are listed under each provision when known.

HIGHWAYS, ENGLAND AND WALES

Made 11th February 1993

Coming into force 10th March 1993

The Secretary of State for Transport makes this Order in exercise of powers conferred by sections 10, 41 and 106 of the Highways Act 1980f1, and now vested in himf2, and of all other enabling powers:–

Annotations to the whole text

Footnotes

f1

1980 c. 66.

f2

S.I. 1981/238.

Contents

  1. 1Article 1
  2. 2Article 2
  3. 3Article 3
  4. 4Article 4
  5. 5Article 5
  6. 6Article 6
  7. Signature
  8. Schedule 1Schedule 1
  9. Schedule 2Schedule 2
  10. Schedule 3Schedule 3

1

The new highways which the Secretary of State proposes to construct along the route described in Schedule 1 to this Order hereinafter referred to as “the new trunk road” shall become a trunk road as from the date when this Order comes into force.

2

The centre line of the new trunk road is indicated by a heavy black line on the deposited plan.

3

The Secretary of State directs as respects any part of a highway which crosses the route of the new trunk road that–

(a)

where the highway is a highway maintainable at the public expense by a local highway authority, the part in question shall be maintained by that authority, and

(b)

where the highway is not a highway so maintainable and is not maintainable under a special enactment or by reason or tenure, enclosure, or prescription, the Secretary of State shall be under no duty to maintain the part in question;

until, in either case, a date to be specified in a notice given by the Secretary of State to the highway authority for that highway. The date specified will not be later than the date on which the new trunk road is opened for the purposes of through traffic.

4

The Secretary of State is authorised to construct the bridges specified in Schedules 2 and 3 to this Order as part of the new trunk road.

5

In this Order–

(a)

all measurements of distance are measured along the route of the relevant highway; and

(b)

“the deposited plan” means the plan numbered HA 10/YHRO 39 marked “The A63 Trunk Road (Selby By pass) Order 1993”, signed by authority of the Secretary of State and deposited at the Department of Transport, Romney House, 43 Marsham Street, London SW1P 3PY;

(c)

“the A63” means the Liverpool–Leeds–Hull Trunk Road (A63); and

(d)

“the A19” means the East of Snaith–Sunderland Trunk Road (A19).

6

This Order shall come into force on 10th March 1993 and may be cited as the A63 Trunk Road (Selby Bypass) Order 1993.

Signature

Signed by authority of the Secretary of State for Transport.

J P Henry

Regional Director Yorkshire and Humberside Region

Department of Transport

11th February 1993

Schedule 1

The route of the new trunk road is about 9.5 kilometres in length and is in the District of Selby in the County of North Yorkshire. It starts at a point on the A63, 80 metres west of its junction with Whinny Hagg Lane (marked “A” on the deposited plan), then goes in a generally easterly and then northerly direction to a point on the A19, 500 metres north east of the BOCM roundabout (marked “B” on the deposited plan).

Schedule 2

Specifications of the road bridge which crosses the northern end of the Selby Canal south east of Brayton in the County of North Yorkshire.

Schedule 3

Specifications of the road bridge over the River Ouse to the east of Selby in the County of North Yorkshire.