Article 2 End of access preparation period
In relation to land which is coastal margin, as a result of the relevant approval of the relevant report, the day appointed as the day on which the access preparation periodf1 ends, is 26th March 2025.
Annotations
Footnotes
- f1
-
The term “access preparation period” is defined in section 3A(10) of the Countryside and Rights of Way Act 2000.