The Access to the Countryside (Coastal Margin) (Humber Bridge to Easington) Order 2025
S.I. 2025/335 · Made 12 March 2025
Countryside, England
Made 12th March 2025
Coming into force 13th March 2025
The Secretary of State makes this Order in exercise of the powers conferred by section 3A(10) of the Countryside and Rights of Way Act 2000f1.
Annotations to the whole text
Footnotes
- f1
-
2000 c. 37; section 3A was inserted by the Marine and Coastal Access Act 2009 (c. 23), section 303(5).
Contents
- 1Citation and commencement and interpretation
- 2End of access preparation period
- Signature
- Explanatory note
1Citation and commencement and interpretation
This Order may be cited as the Access to the Countryside (Coastal Margin) (Humber Bridge to Easington) Order 2025 and comes into force on the day after the day on which it is made.
In this Order—
-
“the Act” means the National Parks and Access to the Countryside Act 1949f1;
-
“the relevant approval” means the approval by the Secretary of Statef2 under section 52(1) of the Actf3 of the relevant report on 2nd March 2022;
-
“the relevant report” means the report titled “England Coastal Path Humber Bridge to Easington” submitted by Natural England to the Secretary of State under sections 51 and 55A of the Actf4 on 12th May 2021f5.
2End of access preparation period
In relation to land which is coastal margin, as a result of the relevant approval of the relevant report, the day appointed as the day on which the access preparation periodf1 ends, is 26th March 2025.
Signature
Hayman of Ullock
Parliamentary Under Secretary of State
Department for Environment, Food and Rural Affairs
12th March 2025
Explanatory note
(This note is not part of the Order)
This Order appoints the day on which the access preparation period ends in relation to land which is coastal margin as a result of the approval by the Secretary of State of Natural England’s proposals contained in a report relating to coastal access along the long-distance route between Humber Bridge and Easington. A copy of the Secretary of State’s notice of approval is available at www.gov.uk and a copy may also be obtained by writing to the Department for Environment, Food and Rural Affairs, Seacole Building, 2 Marsham Street, London SW1 4DF.
An impact assessment has not been prepared in respect of this Order because the assumptions underlying the Order were reflected in the impact assessment which was prepared for the Marine and Coastal Access Act 2009 (c. 23). It is available at www.gov.uk, or may be obtained by writing to the Commons and Access Implementation Team at the Department for Environment, Food and Rural Affairs at the address given above.