Paragraph
In the local government area of West Lothian—
Work No. 1E—A footbridge over the railway (Work No.1) at the new station at Armadale.
Work No. 1F—A footbridge over the Bathgate branch railway at the relocated Bathgate station.
Work No. 1G—A railway (480 metres in length and forming sidings for a freight depot at Boghall) commencing by a junction with the Bathgate branch railway at a point 28 metres east of the bridge carrying the A7066 over that railway, passing eastwards, and terminating at Boghall at a point 69 metres west of the bridge carrying Starlaw Road over the M8.