Paragraph 7 Operational restrictions
(1)
Before the commencement of operations at the site, and for so long as such operations continue, A.B. Ports shall provide and maintain the noise barrier authorised by article 5(2) at a height of 5 metres above the level of Work No. 1.
(2)
In sub-paragraph (1), “the site” has the meaning given by paragraph 8(4) below.