Article 38 Lights on tidal works during constructionI1
England and Wales
The undertaker must at or near—
a tidal work, including any temporary work; or
any plant, equipment or other obstruction placed in connection with any authorised development, within the area of seaward construction activity in the River Humber,
F1during the whole time of the construction, alteration or extension, every night from sunset to sunrise exhibit such lights, if any, and take such other steps for the prevention of danger to navigation as Trinity House, the ABP Statutory Harbour Authority or Statutory Conservancy and Navigation Authority may from time to time direct.
In this article, “area of seaward construction activity” means the area of the sea within the Order limits.
Annotations
Textual amendments
- F1
Words in art. 38(1) substituted (11.2.2025) by The Associated British Ports (Immingham Eastern Ro-Ro Terminal) Development Consent (Correction) Order 2025 (S.I. 2025/143), art. 1, Sch.
Commencement
- I1
Art. 38 in force at 25.10.2024, see art. 1