Article 7 Limits of deviationI1
England and Wales
In carrying out the authorised development comprising the works numbered in Schedule 1 (authorised development) the undertaker may—
deviate laterally from the lines or situations of the authorised development shown on the works plans to the extent of the limits of deviation shown on those plans for that work; and
deviate vertically from the levels of the authorised development shown on the engineering sections, drawings and plans:
to any extent upwards as the undertaker considers to be necessary or convenient but not exceeding two metres; or
save for Work No. 2 in Schedule 1 (authorised development), to any extent downwards as the undertaker considers to be necessary or convenient.