Paragraph 1 Work No. 1I1

England, Wales and Scotland

Within the area shown on sheets 1, 2 and 3 of the works plans as Work No. 1, a multi-user marine terminal for the import and export of bulk liquids including—

(a)

Work No. 1a, within the area shown as such, being—

(i)

an open piled approach jetty leading to a jetty head with a single berth with loading and unloading platforms and associated dolphins, fenders and walkways; and

(ii)

supporting jetty topside infrastructure including marine loading arms, pipes, valves, pipe racks and other process equipment, roadways, footways, maintenance and access platforms, lighting infrastructure, utilities (including electrical systems, firewater systems, communication systems, security systems and potable water supply), ship access equipment, electrical rooms, control rooms, shelters, toxic refuge rooms and other berth furniture;

(b)

a dredged pocket to create a berthing pocket;

(c)

piling works and other construction works (including cathodic protection, scour prevention and remediation works); and

(d)

related landside infrastructure including a jetty access ramp, flood defence access ramp, other access infrastructure, local flood defence works, pipelines, pipes, lighting infrastructure, utilities (including electrical systems, communication systems, security systems and potable water supply), drainage, culverts, traffic control systems, gates and fencing.

Annotations

Commencement

I1

Sch. 1 para. 1 in force at 27.2.2025, see art. 1

Notes on Part 1

Footnotes

f1

There are amendments to section 14 which are not relevant to this Order.

f2

2008 c. 29. Section 24(2)(a) was amended by section 33(3) of the Wales Act 2017 (c. 4).

f3

2008 c. 29. Section 115(2) was amended by section 160(3) of the Housing and Planning Act 2016 (c. 22). There are other amendments to section 115 which are not relevant to this Order.