Paragraph 114 InterpretationI1
England, Wales and Scotland
In this part of this Schedule—
“construction” includes execution, placing, altering, replacing, relaying and removal; and “construct” and “constructed” must be construed accordingly;
“drainage work” means any ordinary watercourse and includes any land that provides or is expected to provide flood storage capacity for any ordinary watercourse and any bank, wall, embankment or other structure, or any appliance, constructed or used for land drainage or flood defence in connection with an ordinary watercourse;
“ordinary watercourse” has the meaning given in section 72 (Interpretation) of the Land Drainage Act 1991f1;
“plans” includes sections, drawings, specifications and method statements;
“specified works” means—
- (a)
the making of any opening into or connections with any watercourse or drain in connection with the authorised development; and/or
- (b)
so much of any work or operation of the authorised development as is in, on, under, over or within 9 metres of a drainage work for which the Board has responsibility or is otherwise likely to—
- (i)
affect any such drainage work;
- (ii)
affect the total volume or volumetric rate of flow of water in or flowing to or from any such drainage work;
- (iii)
affect the flow of water in any such drainage work; or
- (iv)
affect the conservation, distribution or use of water resources.
- (i)
- (a)