OpenLegislation

Paragraph 3 Licensed marine activitiesI1

England, Wales and Scotland

(1)

Subject to the licence conditions in Part 2, this licence authorises the undertaker to carry out licensable marine activities under section 66(1) (licensable marine activities) of the 2009 Act which—

(a)

form part of, or are related to, the authorised development; and

(b)

are not exempt from requiring a marine licence by virtue of any provision made under section 74 (exemption specified by order) of the 2009 Act.

(2)

For the purposes of this licence “the authorised development” means the construction, operation and maintenance of a liquid bulk facility on the River Humber comprising—

(a)

within the area shown as Work No.1a on the works plans—

(i)

an open piled approach jetty carrying on its surface a roadway, a footway, pipes, pipework and utilities and lighting, rising from ground level to cross over existing flood defence infrastructure and then extending from the shore in a north easterly direction connecting to a jetty head;

(ii)

a jetty head comprising structures including loading and unloading platforms with mechanical loading arms, two breasting dolphins with fenders, each with a gangway tower and eight mooring dolphins linked by walkways;

(iii)

four monopiles located in front of the jetty head or loading platform to provide fendering for smaller vessels;

(iv)

a jetty head building, a separate refuge building with attached office, water closet and external safety shower, an electrical building, shelters, pump housing and pump canister;

(v)

a jetty operations building located near the landside end of the jetty to house control room functions including switch room, operations room and welfare facilities;

(vi)

topside infrastructure installed on the jetty to load and unload vessels including marine loading arms, gangways, pipes, piping, valves and other process equipment, maintenance access roadways and access ramps;

(vii)

lighting infrastructure, utilities and electrical systems including firewater systems, communication systems and security systems;

(viii)

piling works and construction operations within the River Humber;

(b)

within the area shown as Work No.1 on sheets 1, 2, 3 and 4 of the works plans, capital dredging works within the River Humber related to the works to which paragraph 3(2)(a) refers and the disposal of any arisings from such dredging;

(c)

activities including works to—

(i)

alter, clean, modify, dismantle, refurbish, reconstruct, carry out excavations and clearance (excluding clearance or detonation of ordnance), deepen, scour and cleanse;

(ii)

temporarily remove, alter, strengthen, interfere with, occupy and use the banks, bed, foreshore and waters of the River Humber;

(iii)

remove, relocate or replace any work or structure;

(iv)

construct, place and maintain works and structures including piled fenders; and

(v)

alter the course or otherwise interfere with navigable or non-navigable watercourses;

(d)

such other works as may be necessary or convenient for the purposes of, or in connection with or in consequence of, the construction, maintenance, operation or use of the authorised development, including works for the accommodation or convenience of vessels (including but not limited to berthing and mooring facilities, ladders, buoys, bollards, dolphins, fenders and pontoons) and lighting.

Annotations

Commencement

I1

Sch. 3 para. 3 in force at 27.2.2025, see art. 1