OpenLegislation

Schedule 7 TRAFFIC REGULATION MEASURES

Original text. Later amendments are not shown.

(1) Area(2) Extent of temporary traffic signal and banksman control area
Halfpenny Toll LaneExtents of banksman control and temporary traffic signal control to enable street works for the improvement of access 2/01 in the area shaded green shown on sheet 2 of the streets, rights of way and access plans.
Halfpenny Toll LaneExtents of banksman control and temporary traffic signal control to enable street works for the improvement of access 2/03 in the area shaded green shown on sheet 2 of the streets, rights of way and access plans.
Heckington RoadExtents of banksman control and temporary traffic signal control to enable street works for the creation of access 4/01 and improvement of access 4/02 in the area shaded green shown on sheet 4 of the streets, rights of way and access plans.
Howell Fen DroveExtents of banksman control and temporary traffic signal control to enable street works for the improvement of access 5/02 in the area shaded green shown on sheet 5 of the streets, rights of way and access plans.
Howell Fen DroveExtents of banksman control and temporary traffic signal control to enable street works for the creation of accesses 5/05 and 5/06 in the area shaded green shown on sheet 5 of the streets, rights of way and access plans.
A17 LaybyExtents of banksman control and temporary traffic signal control to enable street works for the creation of access 6/01 in the area shaded green shown on sheet 6 of the streets, rights of way and access plans.
A17 LaybyExtents of temporary closure to all non-site traffic, to allow establishment and operation of a construction traffic access to the authorised development between points TTRO-6/01 and TTRO-6/02 as shown on sheet 6 of the streets, rights of way and access plans.
Asgarby RoadExtents of banksman control and temporary traffic signal control to enable street works for the creation of accesses 6/03 and 6/04 in the area shaded green shown on sheet 6 of the streets, rights of way and access plans.
Littleworth DroveExtents of banksman control and temporary traffic signal control to enable street works for the creation of accesses 7/01 and 7/02 in the area shaded green shown on sheet 7 of the streets, rights of way and access plans.
A17Extents of banksman control and temporary traffic signal control to enable street works for the improvement of access 8/01 in the area shaded green shown on sheet 8 of the streets, rights of way and access plans.
Carterplot RoadExtents of banksman control and temporary traffic signal control to enable street works for the creation of access 9/02 in the area shaded green shown on sheet 9 of the streets, rights of way and access plans.