Regulation 6 High Speed Railway Transport NetworkI1
England and Wales
(1)
The biodiversity gain planning condition does not apply in relation to planning permission for development forming part of, or ancillary to, the high speed railway transport network comprising connections between all or any of the places or parts of the transport network specified in section 1(2) of the High Speed Rail (Preparation) Act 2013f1.
(2)
In this regulation “transport network” and “high speed railway transport network” have the same meaning as in the High Speed Rail (Preparation) Act 2013.
Annotations
Commencement
- I1
Reg. 6 in force at 12.2.2024, see reg. 1(2)
Footnotes
- f1