Regulation 7 Requirements for new-build propertiesI1

England and Wales

F1(1)

A property meets the requirements in this regulation where the building—

(a)

was built principally with the use of the labour or resources of the first owner (including where the resource was a loan which the first owner was liable to repay), F2...

(b)

has not, while it was built or at any subsequent time been owned wholly or partly by a person who is not an individual F3, and

F4(c)

is not part of an excluded property development.

F5(2)

In this regulation—

  • “excluded property development” means a development of multiple buildings constructed on a plot acquired from a person who decided or offered the plans or specifications to which the buildings were wholly or mainly built.

Annotations

Textual amendments

F1

Reg. 7 renumbered as reg. 7(1) (8.5.2024) by The Boiler Upgrade Scheme (England and Wales) (Amendment) Regulations 2024 (S.I. 2024/524), regs. 1(2), 7(a) (with reg. 25)

F2

Word in reg. 7(1)(a) omitted (8.5.2024) by virtue of The Boiler Upgrade Scheme (England and Wales) (Amendment) Regulations 2024 (S.I. 2024/524), regs. 1(2), 7(b) (with reg. 25)

F3

Word in reg. 7(1)(b) inserted (8.5.2024) by The Boiler Upgrade Scheme (England and Wales) (Amendment) Regulations 2024 (S.I. 2024/524), regs. 1(2), 7(c) (with reg. 25)

F4

Reg. 7(1)(c) inserted (8.5.2024) by The Boiler Upgrade Scheme (England and Wales) (Amendment) Regulations 2024 (S.I. 2024/524), regs. 1(2), 7(d) (with reg. 25)

F5

Reg. 7(2) inserted (8.5.2024) by The Boiler Upgrade Scheme (England and Wales) (Amendment) Regulations 2024 (S.I. 2024/524), regs. 1(2), 7(e) (with reg. 25)

Commencement

I1

Reg. 7 in force at 23.5.2022, see reg. 1(1)