Paragraph 2 I1
England and Wales
The information is—
the installer’s name, any trading or other name by which the installer is commonly known, and registered office (where applicable) or principal place of activity, and company registration number (where applicable),
the installer’s certification number in relation to the Microgeneration Certification Scheme, F1or a subsequent version of the Microgeneration Certification Scheme, under which they are certified,
the name of the consumer code of which the installer is a member, F2and the membership or certification number of the consumer code of which the installer is a member,
where the grant application is made on behalf of the installer by an individual, information to enable the Authority to satisfy itself—
as to the identity of that individual, and
that the individual has authority from the installer to make the grant application,
details of a bank account in the installer’s name which accepts pound sterling deposits in the United Kingdom,
details of the property, including—
the address,
whether it F3has had any heating system installed and was, or will be first occupied or used before the date on which the eligible plant was, or is to be, commissioned,
in the case of a grant application relating to the installation of a biomass boiler, whether it is—
in an urban area
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
falls within regulation 5(1)(d) and meets the requirements in regulation 7 (new-build properties),
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
details of the original heating system in relation to the property (where applicable),
whether the property is fuelled by mains gas,
details of the eligible plant to be installed in the property, including whether it is an F9air-to-water heat pump, air-to-air heat pump, a ground source heat pump, or a biomass boiler,
details of any supplementary appliance installed or retained in the property, where applicable,
where the property—
has a valid energy performance certificate, the unique reference number for the valid energy performance certificate for the property, or
does not have a valid energy performance certificate—
the unique reference number for an expired energy performance certificate for the property (if any) where required by the Authority, and
any other information that the Authority may require to verify any information provided under this Schedule,
details of the quote provided by the installer to the owner of the property for the installation of the eligible plant,
the name, address, email address (if available), and telephone number of the owner of the property, and
such other information, or declarations from the installer, as the Authority may require to enable it to determine the grant application.
Annotations
Textual amendments
- F1
Words in Sch. 2 para. 2(b) substituted (28.4.2026) by The Boiler Upgrade Scheme (England and Wales) (Amendment) Regulations 2026 (S.I. 2026/390), regs. 1(2), 16(2)(a) (with reg. 19)
- F2
Words in Sch. 2 para. 2(c) substituted (8.5.2024) by The Boiler Upgrade Scheme (England and Wales) (Amendment) Regulations 2024 (S.I. 2024/524), regs. 1(2), 23(a) (with reg. 25)
- F3
Words in Sch. 2 para. 2(f)(ii) substituted (8.5.2024) by The Boiler Upgrade Scheme (England and Wales) (Amendment) Regulations 2024 (S.I. 2024/524), regs. 1(2), 23(b) (with reg. 25)
- F4
Sch. 2 para. 2(f)(iii)(bb) omitted (8.5.2024) by virtue of The Boiler Upgrade Scheme (England and Wales) (Amendment) Regulations 2024 (S.I. 2024/524), regs. 1(2), 23(c) (with reg. 25)
- F5
Word in Sch. 2 para. 2(f)(iv)(aa) omitted (8.5.2024) by virtue of The Boiler Upgrade Scheme (England and Wales) (Amendment) Regulations 2024 (S.I. 2024/524), regs. 1(2), 23(d) (with reg. 25)
- F6
Sch. 2 para. 2(f)(iv)(bb) omitted (8.5.2024) by virtue of The Boiler Upgrade Scheme (England and Wales) (Amendment) Regulations 2024 (S.I. 2024/524), regs. 1(2), 23(e) (with reg. 25)
- F7
Sch. 2 para. 2(g) omitted (8.5.2024) by virtue of The Boiler Upgrade Scheme (England and Wales) (Amendment) Regulations 2024 (S.I. 2024/524), regs. 1(2), 23(f) (with reg. 25)
- F8
Sch. 2 para. 2(ha) inserted (8.5.2024) by The Boiler Upgrade Scheme (England and Wales) (Amendment) Regulations 2024 (S.I. 2024/524), regs. 1(2), 23(g) (with reg. 25)
- F9
Words in Sch. 2 para. 2(i) substituted (28.4.2026) by The Boiler Upgrade Scheme (England and Wales) (Amendment) Regulations 2026 (S.I. 2026/390), regs. 1(2), 16(2)(b) (with reg. 19)
- F10
Sch. 2 para. 2(ia) inserted (28.4.2026) by The Boiler Upgrade Scheme (England and Wales) (Amendment) Regulations 2026 (S.I. 2026/390), regs. 1(2), 16(2)(c) (with reg. 19)
- F11
Sch. 2 para. 2(j) substituted (28.4.2026) by The Boiler Upgrade Scheme (England and Wales) (Amendment) Regulations 2026 (S.I. 2026/390), regs. 1(2), 16(2)(d) (with reg. 19)
Commencement
- I1
Sch. 2 para. 2 in force at 23.5.2022, see reg. 1(1)