The information is—

(a)

the unique reference number under which the eligible plant is certified under the Microgeneration Certification Scheme F1...,

(b)

the unique identifier of the boiler upgrade voucher,

(c)

the name of the manufacturer, the model, and the serial number of the eligible plant installed for the eligible property F2...,

(d)

where the eligible plant installed was a biomass boiler, the biomass emissions certificate,

F3(da)

the date that the eligible plant was commissioned,

F4(e)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . and

(f)

such other information as the Authority may require to enable it to determine the redemption application.

Annotations

Textual amendments

F1

Words in Sch. 3 para. 2(a) omitted (28.4.2026) by virtue of The Boiler Upgrade Scheme (England and Wales) (Amendment) Regulations 2026 (S.I. 2026/390), regs. 1(2), 17 (with reg. 19)

F2

Words in Sch. 3 para. 2(c) omitted (8.5.2024) by virtue of The Boiler Upgrade Scheme (England and Wales) (Amendment) Regulations 2024 (S.I. 2024/524), regs. 1(2), 24(a) (with reg. 25)

F3

Sch. 3 para. 2(da) inserted (8.5.2024) by The Boiler Upgrade Scheme (England and Wales) (Amendment) Regulations 2024 (S.I. 2024/524), regs. 1(2), 24(b) (with reg. 25)

F4

Sch. 3 para. 2(e) omitted (8.5.2024) by virtue of The Boiler Upgrade Scheme (England and Wales) (Amendment) Regulations 2024 (S.I. 2024/524), regs. 1(2), 24(c) (with reg. 25)

Commencement

I1

Sch. 3 para. 2 in force at 23.5.2022, see reg. 1(1)