Paragraph 2
In this Schedule—
-
“accumulation” means any accumulation of silt or other material which constitutes an impediment to navigation;
-
“the Channel” means the Back Water Channel;
-
“construction” includes execution, placing and maintenance and “constructed” shall be construed accordingly;
-
“erosion” means any erosion of the bed or banks of the Channel or other structure of whatever nature; and
-
“plans” includes arrangements, sections, descriptions, drawings and specifications.