Schedule 1 SCHEDULED WORKSI1
England and Wales
In the Borough of Boston, Lincolnshire
-
Work No.1 — A barrier, with a rising sector gate, across the Haven, at a location situated approximately 100 metres eastwards of the Black Sluice Complex, including reclamation on the left bank of the Haven, the removal of the existing loading jetty on the right bank of the Haven and providing a channel width of 25 metres. Work No.1 includes scour protection and flood defence walls linking to other flood defences, the installation of perimeter fencing and other structures.
-
Work No.2 — A building for control and associated purposes in relation to Work No.1, at a location situated on the left bank of the Haven adjacent to the barrier which forms part of Work No.1. Work No.2 includes the construction of hardstanding areas for storage, use by heavy goods vehicles, parking, a crane pad and the installation of perimeter fencing.
-
Work No.3A — A replacement gate across the existing entrance to the Wet Dock, at a location situated 170 metres westwards of Maud Foster Sluice, providing a channel width when open of not less than 18 metres together with an associated structure for control of the replacement gate.
-
Work No.3B — Works to widen the river channel within the existing entrance to the Wet Dock.
-
Work No.3C — Works to widen the river channel within the existing entrance to the Wet Dock.
-
Work No.4A — Flood defence walls along the left bank of the Haven including a sheet piled wall along the existing quay frontage, 360 metres in length, together with a concrete/sheet piled flood wall 610 metres in length, commencing at the termination point of Work No.1 and terminating at the Wet Dock. Work No.4A includes the construction of vehicular access gates, each with an opening width of between 6 and 10 metres, and scour protection.
-
Work No.4B — Flood defence walls along the left bank of the Haven including a concrete flood wall, 180 metres in length, commencing at the Wet Dock and terminating at Maud Foster Sluice. Work No.4B includes the construction of vehicular access gates, each with an opening width of between 6 and 10 metres.
-
Work No.5A — Flood defence walls along the right bank of the Haven including a sheet piled wall with concrete capping beam along the existing embankment, 110 metres in length, commencing at the Black Sluice Complex and terminating at the commencement point of Work No.1.
-
Work No.5B — Flood defence walls along the right bank of the Haven including a sheet piled wall with concrete capping beam along the existing embankment, 430 metres in length, commencing at the termination point of Work No.1 and terminating at TF 3324 4291. Work No.5B includes scour protection and includes the incorporation of an existing surface water discharge pipe.
-
Work No.6 — Upgrading of an existing road within the Port of Boston, 650 metres in length, commencing at the existing entrance to the Port of Boston which lies adjacent to St John’s Road and terminating at Work No.2.
-
Work No.7 — 3no. (11kv) electricity cables (185 metres in length), being a 200 metres diversion of 3no. existing (11kv) electricity cables, commencing at TF 3283 4275 and terminating at the junction of Wyberton Low Road with London Road.
-
Work No.8 — Replacement of and extension to an existing grain tower and conveyor system (ship loading facility) at a location adjacent to Work No.4A.
Annotations
Commencement
- I1
Sch. 1 in force at 2.1.2018, see art. 1