OpenLegislation

Article 9 Electoral areas in Milton Keynes

Original text. Later amendments are not shown.

(1)

On 1st May 1996 the existing wards of Milton Keynesf1 shall be abolished and the said area shall be divided into twenty-four wards which shall bear the names set out in column (1) of Schedule 1 to this Order.

(2)

The wards shall comprise the areas respectively described in column (2) of Schedule 1 and the number of councillors to be elected for each ward shall be the number specified in respect of the ward in column (3) of that Schedule.

Annotations

Footnotes

f1

As set out in the Borough of Milton Keynes (Electoral Arrangements) Order 1976 (S.I. 1976/284).