Regulation 3 Amendment of regulation 2 of the Building RegulationsI1
England and Wales
In regulation 2(1) (interpretation)—
(a)
in the definition of “energy efficiency requirements”—
(i)
after “26B” insert “, 26C”;
(ii)
for “and 40” substitute “40 and 40A, ”;
(b)
after the definition of “softened wholesome water” insert—
“;
“system for on-site electricity generation” means a system that produces electricity and has a direct electrical connection to the building in question.”