Regulation 35 Mandatory occurrence reporting: definitionsI1
England and Wales
In regulations F131 to 34—
“construction phase” (“cyfnod adeiladu”) means the period of time beginning when the HRB work, a stage of HRB work or work to existing HRB starts and ending when the work is completed;
“HRB design work” (“gwaith dylunio ARU”) means design of any HRB work, stage of HRB work or work to existing HRB;
“principal dutyholders” (“prif ddeiliaid dyletswyddau”) means the principal contractor (or sole contractor) and the principal designer (or sole or lead designer);
“reporting person” (“person sy’n adrodd”) means—
- (a)
any designer (including the principal designer),
- (b)
any contractor (including the principal contractor), and
- (c)
any other person who is a periodic visitor on the site of work;
- (a)
“safety occurrence” (“achlysur diogelwch”) means—
- (a)
in relation to a design, an aspect of design relating to the structural integrity or fire safety of a higher-risk building that would, if built, meet the risk condition;
- (b)
otherwise, an incident or situation relating to the structural integrity or fire safety of a higher-risk building that meets the risk condition.
- (a)
In the definition of “safety occurrence”, the “risk condition” is that use of the building in question without the incident or situation being remedied would be likely to present a risk of a significant number of deaths, or serious injury to a significant number of people.