Regulation 21 Period for consideration of transfer certificate and report by local authorityI1
England and Wales
For the purposes of section 53C(6)(a) of the 1984 Act, the prescribed period is 28 days beginning with the day on which the transfer certificate and transfer report is given to the local authority.