Part 9B Infrastructure for the charging of electric vehiclesF1
England and Wales
- 44DApplication of paragraph S1 of Schedule 1 (the erection of new residential buildings)
- 44EApplication of paragraph S2 of Schedule 1 (dwellings resulting from a material change of use)
- 44FApplication of paragraph S3 of Schedule 1 (residential buildings undergoing major renovation)
- 44GApplication of paragraph S4 of Schedule 1 (erection of new buildings which are not residential buildings or mixed-use buildings)
- 44HApplication of paragraph S5 of Schedule 1 (buildings undergoing major renovation which are not residential buildings or mixed-use buildings)
- 44IApplication of paragraph S6 of Schedule 1 (the erection of new mixed-use buildings and mixed-use buildings undergoing major renovation)
- 44JMinimum standards of an electric vehicle charge point
- 44KInterpretation of this Part and Part S of Schedule 1
Annotations
Textual amendments
- F1
Pt. 9B inserted (E.) (15.6.2022) by The Building Regulations etc. (Amendment) (England) (No. 2) Regulations 2021 (S.I. 2021/1392), regs. 1(2), 2(3) (with regs. 1(4), 4)