Paragraph 106 As built drawings
(1)
The undertaker will immediately prior to the issuing of the final certificate for each of the specified works at a specific specified works location provide to the local highway authority six copies of an as built drawing at a true scale of not less than 1:500, showing the following information—
(a)
Any key alterations to the layout/ adoptable areas which may have occurred through the construction process.
(b)
The location and type of all street furniture, including, street lighting columns, lit and unlit bollards and the like.
(c)
Gully locations and connections to the adopted sewer system, including lengths protected with concrete bed and surround.
(d)
Lengths of highway drain.