OpenLegislation

The Cambridgeshire County Council (Construction of Cambridge Chesterton / Abbey Foot / Cycle Bridge) Scheme 2018 Confirmation Instrument 2019 in Wales

S.I. 2019/206 · Made 31 January 2019

Original text. legislation.gov.uk does not revise statutory instruments, so later amendments are not shown here. Changes made to it are listed under each provision when known.

Highways, England

Made 31st January 2019

Coming into force in accordance with article 1

The Secretary of State for Transport, makes this Instrument in exercise of the powers conferred by section 106(3) of the Highways Act 1980f1, and now vested in the Secretary of Statef2:

Annotations to the whole text

Footnotes

f1

1980 c. 66. Section 106(3) is amended by the Infrastructure Act 2015 (c. 7), paragraph 34(2) of Schedule 1(1).

f2

S.I. 1981/238

Contents

  1. 1Section 1
  2. 2Section 2
  3. 3Section 3
  4. Signature
  5. Schedule THESchedule THE
  6. Schedule THE SCHEDULE TO THE SCHEMESchedule THE SCHEDULE TO THE SCHEME
  7. Explanatory note

1

This Instrument may be cited as “The Cambridgeshire County Council (Construction of Cambridge Chesterton / Abbey Foot / Cycle Bridge) Scheme 2018 Confirmation Instrument 2019” and shall come into force on the date on which notice that it has been confirmed is first published in accordance with paragraph 1 of Schedule 2 to the Highways Act 1980.

2

The Cambridgeshire County Council (Construction of Cambridge Chesterton / Abbey Foot / Cycle Bridge) Scheme 2018, and as set out in the Schedule, is hereby confirmed with modifications.

3

The Scheme as confirmed is set out in the Schedule (including the plan) and copies of the Scheme with its accompanying plan are deposited at the offices of the Department for Transport, Floor 13 (IMD), Ashdown House, St Leonards on Sea, Hastings, East Sussex TN37 7GA and at the offices of the Cambridgeshire County Council, Shire Hall, Castle Hill, Cambridge CB3 0AP.

Signature

Signed by authority of the Secretary of State for Transport

A. Rhind

A Senior Civil Servant

Department for Transport

31st January 2019

Schedule THE

The Cambridgeshire County Council (hereinafter referred to as “the Council”) makes this Scheme in exercise of their powers under Section 106(3) of the Highways Act 1980 and of all other powers enabling them in that behalf.

1

The Council are authorised to construct over the navigable waters of the River Cam the bridge specified in the Schedule to this Scheme as part of the highway which they are proposing to construct between the Chesterton and the Abbey wards of Cambridge in the said County.

2

The Scheme may be cited as the Cambridgeshire County Council (Construction of Cambridge Chesterton / Abbey Foot / Cycle Bridge) Scheme 2018.

Given under the common seal of the Council on the 15th day of May 2018

C.S

THE COMMON SEAL of the COUNCIL was hereunto affixed in the presence of

Authorised Signatory

Schedule THE SCHEDULE TO THE SCHEME

The location and general plan layout of Chesterton/ Abbey Bridge are shown on the plan marked “The Cambridgeshire County Council (Construction of Cambridge Chesterton / Abbey foot / cycle bridge) Scheme 2018” sealed with the Common Seal of the Cambridgeshire County Council and deposited at Shire Hall, Castle Hill, Cambridge CB3 0AP.

Explanatory note

(This note is not part of the Instrument)

This instrument confirms a Scheme to construct over the navigable waters of the River Cam the bridge specified in the Schedule to this Scheme as part of the highway which they are proposing to construct between the Chesterton and the Abbey wards of Cambridge in the said County.

The Secretary of State has modified this Bridge Scheme as follows:

1

In the opening paragraph on page 1 of the Order a closed bracket has been inserted after the words “the Council”.

2

In the Schedule to the Scheme, under “PLANS AND SPECIFICATIONS OF CAMBRIDGE CHESTERTON / ABBEY FOOT / CYCLE BRIDGE (SCHEME 2018)” the “s” has been deleted from “plans” and the word “scheme” within the title of the plan has been amended to “Scheme”. The paragraph has also been amended to accord with the single replacement plan.

3

In the Schedule to the Scheme, the paragraph titled “North Approach – Top of the North Abutment” the word “approximately” has been deleted and the measurement of 40 metres has been amended to 42.23 metres.

4

In the Schedule to the scheme, the paragraph titled “Ditton Meadows Approach – Top of the South Abutment” the word “approximately” has been deleted and the measurement of 30 metres has been amended to 35.79 metres.

5

In the Schedule to the Scheme, the heading “Headroom and Waterway” has been amended to “Headway and Waterway” and the measurements of 24.78m, +7.04m AOD and 109mm have been amended to 28.97m, +7.03m AOD and 3.17m respectively.

6

In the Schedule to the Scheme, the second paragraph under “Overall Dimensions” the measurements of 4.5 metres, 2.64 metres, 2.19 metres and 4.5 metres have been amended to 4.51 metres, 2.69 metres, 2.22 metres and 4.51 metres respectively.

7

In the Schedule to the Scheme, the fourth paragraph under “Overall Dimensions” the word “approximately” has been deleted and the measurements of 88 metres and 77 metres have been amended to 87.60 metres and 81.3 metres respectively.

8

The plans titled “The Cambridgeshire County Council (Construction of Cambridge Chesterton / Abbey Foot / Cycle Bridge) Scheme 2018 – General Arrangement Plan” and “The Cambridgeshire County Council (Construction of Cambridge Chesterton / Abbey Foot / Cycle Bridge) Scheme 2018 – Longitudinal and Transverse Section” have been replaced by plan Drawing No. 5040126/BR/CB/SK/004 Rev F titled “The Cambridgeshire County Council (Construction of Cambridge Chesterton / Abbey Foot / Cycle Bridge) Scheme 2018”.