Paragraph Work No. 17D
Realignment of Blind Lane commencing in that road at a point 180 metres north-east of the existing bridge carrying the Ashford and Tonbridge Railway over that road, passing under that railway and the railway (Work No. 17) and terminating in Blind Lane at a point 90 metres south-west of the said existing bridge;