OpenLegislation

Paragraph Work No. 22 Barrington Road to Dagenham Dock

A railway (6,700 metres in length) commencing by a junction with the railway (Work No. 7) at its termination, passing eastwards in tunnel beneath the North Circular Road and the River Roding, then south-eastwards beneath Barking Station, Station Parade, Ripple Road and Alfred’s Way, then eastwards beneath Renwick Road and the Ripple Lane Freightliner Terminal to a portal at a point 462 metres south-east of the junction of Morrison Road with Julia Gardens, then continuing eastwards under the railway (Work No. 22A) and the new road (Work No. 22H(1)), across Chequers Lane (to be stopped up) and under Kent Avenue and terminating at a point 85 metres east of the bridge carrying Kent Avenue over the Tilbury Loop Railway, including ventilation shafts on lands off Barrington Road and Alfred’s Way and a footbridge over the railway at Chequers Lane;