Paragraph Work No. 36K
Realignment and improvement of the cycle track between the A228 and the bridge carrying the M2 over the River Medway, commencing by a junction with the cycle track (Work No. 36G) at a point 45 metres south-west of its termination, passing southwards to a junction with the cycle track (Work No. 36J), then south-westwards and south-eastwards and terminating by a junction with the existing cycle track at a point 5 metres south-east of the western abutment of the bridge carrying the M2 over the London and Chatham Railway;
In the city of Rochester-upon-Medway, town of Rochester and parish of Cuxton, and in the borough of Tonbridge and Malling, parishes of Wouldham and Aylesford—