Schedule WITH KEY PLAN (PLAN "A'), SITE PLANS (PLANS "B' AND "C') AND ELEVATION (PLAN "D') ATTACHED

Original text. Later amendments are not shown.

From a point south-west of the canal whose co-ordinates are 387246.55E, 398700.37N to a point north-east of the canal whose co-ordinates are 387256.75E, 398715.04N.

  • CONSTRUCTION

    Precast prestressed concrete beams with insitu reinforced concrete slab deck on reinforced concrete abutments faced with brickwork.

  • SPAN

    17.80 metres clear square span (17.869 metres skew span).

  • WIDTH

    7.3 metres single carriageway with 2 No. 3.0 metre footways (13.3 metres overall width).

  • HEADROOM

    3.28 metres minimum headroom over the centre 5 metre width of the canal above the nominal water level of 63.1 metres A.O.D. and 2.67 metres minimum headroom over the canal towpath.

  • WATERWAY

    The existing canal, walls and towpath will be unaltered.