Paragraph 2 I1
England and Wales
The base of the silo shall extend beyond any walls of the silo and shall be provided at its perimeter with channels designed and constructed so as to collect any silage effluent which may escape from the silo and adequate provision shall be made for the drainage of that effluent from those channels to an effluent tank through a channel or pipe.
Annotations
Commencement
- I1
Sch. 1 para. 2 in force at 1.9.1991, see reg. 1